Skip to content
ManaraAI

The platform

What actually runs when you turn it on.

Fourteen modules across five pillars, one data model, one audit trail, and an agent layer that is allowed to touch all of it, up to the rung you granted.

Modules

Five pillars, fourteen modules.

01

Governance

Compliance management · Evidence management · Policy management

02

Audit

Audit management · Continuous audit

03

Risk

Risk management · Threat management · Asset and vulnerability management

04

Third party

Vendor risk management · Trust Center

05

Operate

Impact Analyst · Integrations · Support · Platform administration

Your first week, before you pay anything.

The same six steps your trial walks you through. Pick a step to see the real screen, or how it works underneath.

Use the left and right arrow keys to move between capabilities.

Connect ⁨SharePoint⁩

Point Manara at SharePoint, GitHub, Azure AD, a cloud account, a ticketing system, a folder of spreadsheets. A connector where an API exists, an agent crawl where one does not, attested upload where nothing will ever reach.

Do this with your own files.

Start 3-day free trial
Connect ⁨SharePoint⁩

Vendor risk, audit management, policy authoring, the Trust Center and the regulator module run on the same model.

Everything GRC. One Platform.

Purpose-built pillars that cover your entire risk and compliance lifecycle.

Compliance Automation

Map frameworks, identify gaps, and continuously track compliance across PDPL, ISO 27001, SOC 2, and more.

Enterprise Risk Management

Auto-generate risk registers, assess likelihood and impact, and monitor risks dynamically across your organization.

Vendor Risk Management

Evaluate, score, and continuously monitor third-party vendors with automated workflows, validations, and alerts.

Continuous Monitoring

Automate control testing, evidence collection, and audit workflows, shifting from periodic reviews to continuous assurance.

Impact Analyst

New

Go beyond visibility: quantify how risks affect your business. Simulate scenarios, assess financial exposure, and understand downstream impact of regulatory and operational changes.

Audit Management

Centralize audit planning, fieldwork, findings, and remediation tracking in one structured workflow.

AgentKit

Specialist agents. Four areas of work.

AgentKit collects evidence, checks controls, drafts policies and assesses third parties — within the authority you grant.

Agents prepare and act within limits. People approve and sign.

Evidence collection

Collect across frameworks, read document stores and link evidence to the controls it supports.

Collection · Discovery · Mapping

Control assurance

Assess implementation, judge whether evidence closes a gap and validate lifecycle transitions.

Assessment · Gap review · Validation

Policy drafting

Draft and complete policy sections against your templates and organisational context.

Drafting · Guided completion

Third-party risk

Prepare questionnaires, assess vendor evidence, track document expiry and stage imported records for review.

Questionnaires · Evidence · Monitoring · Import

Every agent has a ceiling, and it is written down.

Autonomy is not a slider we left at maximum. Each agent is granted exactly one rung, per tenant, in configuration. That rung is stored next to every action it ever takes.

The platform, sweeping

L0

Observe

Read the estate. Index evidence, watch a control, follow a threat feed. Writes nothing, anywhere.

L1

Recommend

Propose a control mapping, draft a policy section, score a vendor. Everything lands as a suggestion carrying its reasoning and the artefact it came from.

L2

Act within limits

Execute inside an envelope an administrator set: collect across a framework, open an issue, dispatch a questionnaire, flag a transaction. Each action is logged with the rung that permitted it.

L3

Act without limits

Never granted

Never granted. No agent accepts a risk, signs an audit, approves a vendor or closes a gap. That signature belongs to a named person, and the platform will not simulate one.

A lighthouse does not move the rocks. It makes them visible early enough to steer around, and that is the whole of what we let an agent do. Reach is authority here: each rung is how far a hand may extend from the source, and the outermost arc is drawn precisely so you can see it is never given.

Evidence out of anything you run.

Three ways in, so the answer is never “that system has no API”.

Connect

Native connectors for GitHub, SharePoint, Azure AD, Teams, Planner and cloud accounts, plus a generic API adapter for everything else. Scoped collection, tested connections, every call logged.

Crawl

Point the Computer Engine at a document store and it reads what is there, works out what each artefact proves, and links it to the controls that need it. No schema, no integration project.

Attest

For the systems that will never open (air-gapped OT, a regulator’s portal, a signed paper record) evidence is taken in with chain-of-custody metadata and carried as attested, marked as such in every report it reaches.

ManaraAI

The integration atlas

Native connectors, cloud posture, cybersecurity signals, and attested paths — mapped in one evidence fabric.

Identity and access

Bring access reviews and ownership evidence into the same register as the controls they support.

Microsoft Entra ID
Azure Active Directory
Okta
Ping Identity
CyberArk

Collaboration and documents

Collect the documents, decisions, and working evidence already moving through your teams.

SharePoint
Microsoft Teams
Slack
Google Drive
Confluence

Engineering and delivery

Connect the code, tickets, and delivery systems that show how controls operate in practice.

GitHub
GitLab
Jira
Azure DevOps
ServiceNow

Cloud infrastructure

Read cloud posture and account evidence across the environments your organisation runs.

AWS
Microsoft Azure
Google Cloud
Oracle Cloud

Cybersecurity and observability

Bring threat, detection, and endpoint signals into the risk and evidence picture without creating another silo.

Microsoft Sentinel
Datadog
LogRhythm SIEM
CrowdStrike Falcon
Splunk

Closed and sovereign estates

For systems that will not open, use agent crawl or attested evidence with chain-of-custody metadata.

Otech
Generic API adapter
Agent crawl
Attested upload

Ways in

REST · Webhook · Microsoft Graph · Cloud provider APIs · CSV and Excel ingestion · Offline export for air-gapped estates

Run it as managed cloud, inside your own private cloud, or entirely on your premises. Same product, same agents, same audit trail.

Many frameworks. One estate.

Each is another orbit around the same organisation, not another programme started from nothing. Add one and the crosswalk carries what you already hold into its controls.

Selected framework

ISO 27001

Establish and maintain an information security management system.

What Makes ManaraAI Different?

Most GRC tooling

A place to record work you still do by hand

ManaraAI

Agents that do the collecting, not a form to record it in

Most GRC tooling

An assistant bolted on, with no stated limits

ManaraAI

An authority ladder every agent runs under, visible in the audit log

Most GRC tooling

Integrations only where a vendor built one

ManaraAI

Evidence from any system, including the ones with no API

Most GRC tooling

The same evidence re-collected per framework

ManaraAI

One artefact mapped across every framework that asks for it

Most GRC tooling

Built for one side of the table

ManaraAI

Built for the regulator's side of the table as well as yours

Most GRC tooling

English-only interfaces

ManaraAI

Arabic and English as one product, not a translation layer

Built for Regulators and Oversight Bodies

ManaraAI enables regulators to:

Digitize and automate regulatory frameworks
Monitor compliance across entities in real time
Assess systemic risk across sectors
Trigger proactive alerts based on risk thresholds

Deployment

Run it where the regulation says it has to run.

Managed cloud

We run it. Automatic updates, continuous monitoring, managed backups and a high-availability architecture.

Your private cloud

Deployed into your own tenancy, inside your network controls and your data-residency boundary.

On premises and air-gapped

For operational technology and sovereign estates: no egress required, evidence carried in by attested export.

Your trial is three questions away.

Three questions and a work email. Your workspace opens with your frameworks and your evidence already lined up.

3 days free. No card required.

Contact us

Get in touch with ManaraAI

Fill out the form below and our team will contact you shortly.

A person answers, usually within one working day.

What do you need?